AmarnepalNepal Data
ProposedProposed / under development

Karnali Chisapani Multipurpose Projectकर्णाली चिसापानी बहुउद्देश्यीय आयोजना

A long-proposed 10,800 MW reservoir mega-project with a ~270 m dam at the Chisapani Gorge on the Karnali River, storing ~12.5 billion m³ for power, irrigation and flood control. Feasibility studies date from the 1960s to 1989 (capacity fixed at 10,800 MW). The government has directed NEA to prepare a fresh DPR and is exploring multi-country financing, but it remains decades from construction.

Installed capacity

10,800 MW

Reservoir

River / basin

Karnali

Karnali basin

Location

Surkhet / Bardiya / Kailali

Karnali / Lumbini / Sudurpashchim

Expected online

TBD

Proposed / under development

Project timeline

Milestones & projected timeline

Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.

  1. 1962–1989

    Successive feasibility studies (capacity set at 10,800 MW)

  2. 2023–25

    Cabinet directs NEA to prepare DPR; financing explored

  3. TBDPlanned

    Construction far in the future if financed

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Karnali Chisapani Multipurpose Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Karnali Chisapani Multipurpose Project?+

The Karnali Chisapani Multipurpose Project has an installed capacity of 10,800 MW. It is a reservoir hydropower scheme.

Which river is the Karnali Chisapani Multipurpose Project on?+

The project is on the Karnali River, part of Nepal's Karnali basin, in Surkhet / Bardiya / Kailali district, Karnali / Lumbini / Sudurpashchim Province.

Who is developing the Karnali Chisapani Multipurpose Project?+

The Karnali Chisapani Multipurpose Project is developed by Government of Nepal / NEA (DPR stage) (government (nea)), with Proposed multi-country financing (India, Bhutan, Bangladesh, Sri Lanka).

What is the status of the Karnali Chisapani Multipurpose Project?+

As of mid-2026 the project is proposed / under development. Long-proposed mega-project; ~270 m dam; NEA directed to prepare a fresh DPR; decades from construction

Sources & data note

Figures for Karnali Chisapani Multipurpose Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.