Likhu IV Hydropower Projectलिखु-४

A 52.4 MW run-of-river plant on the Likhu Khola in Ramechhap/Okhaldhunga, developed by Green Ventures Ltd. Commissioned and connected to the grid on 23 October 2021.

Installed capacity

52 MW

Run-of-river

River / basin

Likhu Khola

Koshi basin

Location

Ramechhap

Bagmati

Commissioned

2021

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 23 Oct 2021

    Commissioned and connected to grid

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Likhu IV Hydropower Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Likhu IV Hydropower Project?+

The Likhu IV Hydropower Project has an installed capacity of 52 MW. It is a run-of-river hydropower scheme.

Which river is the Likhu IV Hydropower Project on?+

The project is on the Likhu Khola River, part of Nepal's Koshi basin, in Ramechhap district, Bagmati Province.

Who is developing the Likhu IV Hydropower Project?+

The Likhu IV Hydropower Project is developed by Green Ventures Ltd (private (ipp)).

What is the status of the Likhu IV Hydropower Project?+

As of mid-2026 the project is operational.

When was the Likhu IV Hydropower Project commissioned?+

The Likhu IV Hydropower Project was commissioned in 2021.