AmarnepalNepal Data
ProposedExpected 2031

Lower Arun Hydroelectric Projectतल्लो अरुण जलविद्युत आयोजना

A 669 MW run-of-river project on the Arun River in Sankhuwasabha and Bhojpur, designed as a downstream cascade of SJVN's 900 MW Arun-3, using its tailrace discharge. Developed by India's SJVN on a BOOT basis; Investment Board Nepal authorised construction and issued the generation licence in August 2025, and a major civil package was awarded in 2026 — placing it at the pre-construction/early-works stage.

Installed capacity

669 MW

Run-of-river

River / basin

Arun

Koshi basin

Location

Sankhuwasabha / Bhojpur

Koshi

Expected online

2031

Proposed / under development

Project timeline

Milestones & projected timeline

Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.

  1. 2022

    MoU with SJVN; supplementary EIA work

  2. 2023

    Nepal approves SJVN investment proposal

  3. 2025

    IBN authorises construction / issues generation licence

  4. 2026Planned

    Civil works package awarded

  5. 2031Planned

    Targeted commissioning (~54-month build)

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Lower Arun Hydroelectric Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Lower Arun Hydroelectric Project?+

The Lower Arun Hydroelectric Project has an installed capacity of 669 MW. It is a run-of-river hydropower scheme.

Which river is the Lower Arun Hydroelectric Project on?+

The project is on the Arun River, part of Nepal's Koshi basin, in Sankhuwasabha / Bhojpur district, Koshi Province.

Who is developing the Lower Arun Hydroelectric Project?+

The Lower Arun Hydroelectric Project is developed by SJVN Limited (India) (foreign-funded), with SJVN Limited (India); IBN-issued generation licence.

What is the status of the Lower Arun Hydroelectric Project?+

As of mid-2026 the project is proposed / under development. BOOT; IBN authorised construction / licence issued Aug 2025; civil package awarded 2026; pre-construction stage

When is the Lower Arun Hydroelectric Project expected to be commissioned?+

The Lower Arun Hydroelectric Project is expected to be commissioned around 2031, though dates for projects under development frequently shift.

Sources & data note

Figures for Lower Arun Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.