Luja Khola Hydroelectric Project
A 24.82 MW run-of-river project on the Luja Khola in Solukhumbu, Koshi Province, developed by Silk Power Ltd. It holds a generation licence and is listed as under construction in the Independent Power Producers' Association (IPPAN) register; detailed milestone dates are not yet published.
Installed capacity
25 MW
Run-of-river
River / basin
Luja Khola
Koshi basin
Location
Solukhumbu
Koshi
Expected online
TBD
Under construction
Milestones & projected timeline
Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.
- Licensed
Generation licence issued; listed as under construction (IPPAN register)
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Luja Khola Hydroelectric Project: key facts
Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.
What is the capacity of the Luja Khola Hydroelectric Project?+
The Luja Khola Hydroelectric Project has an installed capacity of 25 MW. It is a run-of-river hydropower scheme.
Which river is the Luja Khola Hydroelectric Project on?+
The project is on the Luja Khola River, part of Nepal's Koshi basin, in Solukhumbu district, Koshi Province.
Who is developing the Luja Khola Hydroelectric Project?+
The Luja Khola Hydroelectric Project is developed by Silk Power Ltd (private (ipp)).
What is the status of the Luja Khola Hydroelectric Project?+
As of mid-2026 the project is under construction.
Sources & data note
Figures for Luja Khola Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.