Middle Mewa Hydropower Projectमध्य मेवा
A 73.5 MW peaking run-of-river project on the Mewa Khola in Meringden, Taplejung, developed by Mewa Developers (part of Urja Developers), designed for six hours of daily peaking. Its main tunnel breakthrough has been achieved.
Installed capacity
74 MW
Peaking run-of-river
River / basin
Mewa Khola (Tamor)
Koshi basin
Location
Taplejung
Koshi
Expected online
TBD
Under construction
Milestones & projected timeline
Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.
- 2024–25
Headworks progress and main tunnel breakthrough achieved
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Middle Mewa Hydropower Project: key facts
Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.
What is the capacity of the Middle Mewa Hydropower Project?+
The Middle Mewa Hydropower Project has an installed capacity of 74 MW. It is a peaking run-of-river hydropower scheme.
Which river is the Middle Mewa Hydropower Project on?+
The project is on the Mewa Khola (Tamor) River, part of Nepal's Koshi basin, in Taplejung district, Koshi Province.
Who is developing the Middle Mewa Hydropower Project?+
The Middle Mewa Hydropower Project is developed by Mewa Developers (Urja Developers) (private (ipp)).
What is the status of the Middle Mewa Hydropower Project?+
As of mid-2026 the project is under construction.