Modi Khola Hydroelectric Power Plantमोदी खोला
A 14.8 MW run-of-river plant on the Modi Khola in Parbat/Kaski. Owned by NEA and commissioned in 2000.
Installed capacity
15 MW
Run-of-river
River / basin
Modi Khola
Gandaki basin
Location
Parbat
Gandaki
Commissioned
2000
Operational
Milestones to commissioning
The route from construction to commercial operation.
- 2000
Commissioned
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Modi Khola Hydroelectric Power Plant: key facts
Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.
What is the capacity of the Modi Khola Hydroelectric Power Plant?+
The Modi Khola Hydroelectric Power Plant has an installed capacity of 15 MW. It is a run-of-river hydropower scheme.
Which river is the Modi Khola Hydroelectric Power Plant on?+
The project is on the Modi Khola River, part of Nepal's Gandaki basin, in Parbat district, Gandaki Province.
Who is developing the Modi Khola Hydroelectric Power Plant?+
The Modi Khola Hydroelectric Power Plant is developed by Nepal Electricity Authority (government (nea)).
What is the status of the Modi Khola Hydroelectric Power Plant?+
As of mid-2026 the project is operational.
When was the Modi Khola Hydroelectric Power Plant commissioned?+
The Modi Khola Hydroelectric Power Plant was commissioned in 2000.
Sources & data note
Figures for Modi Khola Hydroelectric Power Plant are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.