A 12 MW run-of-river plant on the Madi Khola in Kaski, developed by Himalayan Hydro Power Ltd. One of the earlier private plants in the Madi corridor, it has generated to the grid since August 2015.
Installed capacity
12 MW
Run-of-river
River / basin
Madi Khola
Gandaki basin
Location
Kaski
Gandaki
Commissioned
2015
Operational
Milestones to commissioning
The route from construction to commercial operation.
- Aug 2015
Commercial operation began
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Namarjun Madi Hydropower Project: key facts
Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.
What is the capacity of the Namarjun Madi Hydropower Project?+
The Namarjun Madi Hydropower Project has an installed capacity of 12 MW. It is a run-of-river hydropower scheme.
Which river is the Namarjun Madi Hydropower Project on?+
The project is on the Madi Khola River, part of Nepal's Gandaki basin, in Kaski district, Gandaki Province.
Who is developing the Namarjun Madi Hydropower Project?+
The Namarjun Madi Hydropower Project is developed by Himalayan Hydro Power Ltd (private (ipp)).
What is the status of the Namarjun Madi Hydropower Project?+
As of mid-2026 the project is operational.
When was the Namarjun Madi Hydropower Project commissioned?+
The Namarjun Madi Hydropower Project was commissioned in 2015.