AmarnepalNepal Data
OperationalCommissioned 2024

Nilgiri Khola II (Cascade) Hydropower Projectनिलगिरी खोला-२ (क्यास्केड)

A 71 MW run-of-river cascade plant at Narchang, Annapurna Rural Municipality, Myagdi, developed by Nilgiri Khola Hydropower Company Ltd. The largest hydropower project built in Myagdi, in operation since 6 April 2024.

Installed capacity

71 MW

Run-of-river

River / basin

Nilgiri Khola

Gandaki basin

Location

Myagdi

Gandaki

Commissioned

2024

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 6 Apr 2024

    In operation; connected to grid

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Nilgiri Khola II (Cascade) Hydropower Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Nilgiri Khola II (Cascade) Hydropower Project?+

The Nilgiri Khola II (Cascade) Hydropower Project has an installed capacity of 71 MW. It is a run-of-river hydropower scheme.

Which river is the Nilgiri Khola II (Cascade) Hydropower Project on?+

The project is on the Nilgiri Khola River, part of Nepal's Gandaki basin, in Myagdi district, Gandaki Province.

Who is developing the Nilgiri Khola II (Cascade) Hydropower Project?+

The Nilgiri Khola II (Cascade) Hydropower Project is developed by Nilgiri Khola Hydropower Company Ltd (private (ipp)).

What is the status of the Nilgiri Khola II (Cascade) Hydropower Project?+

As of mid-2026 the project is operational.

When was the Nilgiri Khola II (Cascade) Hydropower Project commissioned?+

The Nilgiri Khola II (Cascade) Hydropower Project was commissioned in 2024.

Sources & data note

Figures for Nilgiri Khola II (Cascade) Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.