Sunkoshi Hydropower Stationसुनकोशी

A 10.05 MW run-of-river plant on the Sun Koshi River in Sindhupalchok, built with Chinese assistance and commissioned in 1972. Owned by NEA.

Installed capacity

10 MW

Run-of-river

River / basin

Sun Koshi

Koshi basin

Location

Sindhupalchok

Bagmati

Commissioned

1972

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 1972

    Commissioned

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Sunkoshi Hydropower Station: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Sunkoshi Hydropower Station?+

The Sunkoshi Hydropower Station has an installed capacity of 10 MW. It is a run-of-river hydropower scheme.

Which river is the Sunkoshi Hydropower Station on?+

The project is on the Sun Koshi River, part of Nepal's Koshi basin, in Sindhupalchok district, Bagmati Province.

Who is developing the Sunkoshi Hydropower Station?+

The Sunkoshi Hydropower Station is developed by Nepal Electricity Authority (government (nea)).

What is the status of the Sunkoshi Hydropower Station?+

As of mid-2026 the project is operational.

When was the Sunkoshi Hydropower Station commissioned?+

The Sunkoshi Hydropower Station was commissioned in 1972.

Sources & data note

Figures for Sunkoshi Hydropower Station are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.