Super Kabeli Khola 'A' Hydropower Projectसुपर काबेली खोला 'ए'
A 13.5 MW run-of-river plant in Sirijangha Rural Municipality, Taplejung, on the Kabeli Khola (a Tamor tributary), developed by Snow Rivers Ltd, part of Taplejung's emerging hydropower cluster.
Installed capacity
14 MW
Run-of-river
River / basin
Kabeli Khola
Koshi basin
Location
Taplejung
Koshi
Commissioned
2024
Operational
Milestones to commissioning
The route from construction to commercial operation.
- 2024
Testing completed; commercial generation began
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Super Kabeli Khola 'A' Hydropower Project: key facts
Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.
What is the capacity of the Super Kabeli Khola 'A' Hydropower Project?+
The Super Kabeli Khola 'A' Hydropower Project has an installed capacity of 14 MW. It is a run-of-river hydropower scheme.
Which river is the Super Kabeli Khola 'A' Hydropower Project on?+
The project is on the Kabeli Khola River, part of Nepal's Koshi basin, in Taplejung district, Koshi Province.
Who is developing the Super Kabeli Khola 'A' Hydropower Project?+
The Super Kabeli Khola 'A' Hydropower Project is developed by Snow Rivers Ltd (private (ipp)).
What is the status of the Super Kabeli Khola 'A' Hydropower Project?+
As of mid-2026 the project is operational.
When was the Super Kabeli Khola 'A' Hydropower Project commissioned?+
The Super Kabeli Khola 'A' Hydropower Project was commissioned in 2024.
Sources & data note
Figures for Super Kabeli Khola 'A' Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.