Super Madi Hydroelectric Projectसुपर मादी

A 44 MW run-of-river plant on the Madi Khola in Madi Rural Municipality, Kaski, with a net head of about 295 m. Promoted by Super Madi Hydropower Ltd (incorporated in 2009 and listed on NEPSE as SMHL), it began supplying test energy to the grid in 2025 after a long build.

Installed capacity

44 MW

Run-of-river

River / basin

Madi Khola

Gandaki basin

Location

Kaski

Gandaki

Commissioned

2025

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 2009

    Company incorporated to develop the project

  2. Mar 2025

    Test production began

    Supplied energy to NEA during a 15-day trial run before commercial operation

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Super Madi Hydroelectric Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Super Madi Hydroelectric Project?+

The Super Madi Hydroelectric Project has an installed capacity of 44 MW. It is a run-of-river hydropower scheme.

Which river is the Super Madi Hydroelectric Project on?+

The project is on the Madi Khola River, part of Nepal's Gandaki basin, in Kaski district, Gandaki Province.

Who is developing the Super Madi Hydroelectric Project?+

The Super Madi Hydroelectric Project is developed by Super Madi Hydropower Ltd (NEPSE: SMHL) (private (ipp)).

What is the status of the Super Madi Hydroelectric Project?+

As of mid-2026 the project is operational.

When was the Super Madi Hydroelectric Project commissioned?+

The Super Madi Hydroelectric Project was commissioned in 2025.

Sources & data note

Figures for Super Madi Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.