A 100 MW run-of-river project on the Trishuli River in Nuwakot, developed by Blue Energy Ltd, one of the larger private projects on the heavily developed Trishuli corridor.

Installed capacity

100 MW

Run-of-river

River / basin

Trishuli

Gandaki basin

Location

Nuwakot

Bagmati

Expected online

TBD

Under construction

Project timeline

Milestones & projected timeline

Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.

  1. Under construction

    Construction ongoing in Nuwakot

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Super Trishuli Hydropower Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Super Trishuli Hydropower Project?+

The Super Trishuli Hydropower Project has an installed capacity of 100 MW. It is a run-of-river hydropower scheme.

Which river is the Super Trishuli Hydropower Project on?+

The project is on the Trishuli River, part of Nepal's Gandaki basin, in Nuwakot district, Bagmati Province.

Who is developing the Super Trishuli Hydropower Project?+

The Super Trishuli Hydropower Project is developed by Blue Energy Ltd (private (ipp)).

What is the status of the Super Trishuli Hydropower Project?+

As of mid-2026 the project is under construction.

Sources & data note

Figures for Super Trishuli Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.