Surke Dudhkoshi Hydroelectric Projectसुर्के दूधकोशी
A proposed 188 MW project on the Dudh Koshi in Solukhumbu, developed by Summit Power Company Ltd, one of several large schemes planned along the Dudh Koshi.
Installed capacity
188 MW
Peaking run-of-river
River / basin
Dudh Koshi
Koshi basin
Location
Solukhumbu
Koshi
Expected online
TBD
Proposed / under development
Milestones & projected timeline
Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.
- Study phase
Under study by Summit Power Company
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Surke Dudhkoshi Hydroelectric Project: key facts
Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.
What is the capacity of the Surke Dudhkoshi Hydroelectric Project?+
The Surke Dudhkoshi Hydroelectric Project has an installed capacity of 188 MW. It is a peaking run-of-river hydropower scheme.
Which river is the Surke Dudhkoshi Hydroelectric Project on?+
The project is on the Dudh Koshi River, part of Nepal's Koshi basin, in Solukhumbu district, Koshi Province.
Who is developing the Surke Dudhkoshi Hydroelectric Project?+
The Surke Dudhkoshi Hydroelectric Project is developed by Summit Power Company Ltd (private (ipp)).
What is the status of the Surke Dudhkoshi Hydroelectric Project?+
As of mid-2026 the project is proposed / under development. Study phase
Sources & data note
Figures for Surke Dudhkoshi Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.