Thulo Khola Hydroelectric Project
A 21.3 MW run-of-river project on the Thulo Khola in Myagdi, Gandaki Province, developed by Samyukta Urja Ltd. It holds a generation licence and is listed as under construction in the Independent Power Producers' Association (IPPAN) register; detailed milestone dates are not yet published.
Installed capacity
21 MW
Run-of-river
River / basin
Thulo Khola
Gandaki basin
Location
Myagdi
Gandaki
Expected online
TBD
Under construction
Milestones & projected timeline
Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.
- Licensed
Generation licence issued; listed as under construction (IPPAN register)
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Thulo Khola Hydroelectric Project: key facts
Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.
What is the capacity of the Thulo Khola Hydroelectric Project?+
The Thulo Khola Hydroelectric Project has an installed capacity of 21 MW. It is a run-of-river hydropower scheme.
Which river is the Thulo Khola Hydroelectric Project on?+
The project is on the Thulo Khola River, part of Nepal's Gandaki basin, in Myagdi district, Gandaki Province.
Who is developing the Thulo Khola Hydroelectric Project?+
The Thulo Khola Hydroelectric Project is developed by Samyukta Urja Ltd (private (ipp)).
What is the status of the Thulo Khola Hydroelectric Project?+
As of mid-2026 the project is under construction.
Sources & data note
Figures for Thulo Khola Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.