Tiplyang Kaligandaki Hydroelectric Projectतिप्ल्याङ कालीगण्डकी

A 58 MW run-of-river project on the Kali Gandaki in Annapurna and Raghuganga rural municipalities, Myagdi, developed by the IME Group, one of several large projects turning the Kali Gandaki into a hydropower corridor.

Installed capacity

58 MW

Run-of-river

River / basin

Kali Gandaki

Gandaki basin

Location

Myagdi

Gandaki

Expected online

2025

Under construction

Project timeline

Milestones & projected timeline

Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.

  1. Licence & PPA

    Construction licence received and PPA signed with NEA

  2. 2025

    Targeted commissioning

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Tiplyang Kaligandaki Hydroelectric Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Tiplyang Kaligandaki Hydroelectric Project?+

The Tiplyang Kaligandaki Hydroelectric Project has an installed capacity of 58 MW. It is a run-of-river hydropower scheme.

Which river is the Tiplyang Kaligandaki Hydroelectric Project on?+

The project is on the Kali Gandaki River, part of Nepal's Gandaki basin, in Myagdi district, Gandaki Province.

Who is developing the Tiplyang Kaligandaki Hydroelectric Project?+

The Tiplyang Kaligandaki Hydroelectric Project is developed by IME Group (private (ipp)).

What is the status of the Tiplyang Kaligandaki Hydroelectric Project?+

As of mid-2026 the project is under construction.

When is the Tiplyang Kaligandaki Hydroelectric Project expected to be commissioned?+

The Tiplyang Kaligandaki Hydroelectric Project is expected to be commissioned around 2025, though dates for projects under development frequently shift.

Sources & data note

Figures for Tiplyang Kaligandaki Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.