Upper Trishuli-1 Hydroelectric Projectमाथिल्लो त्रिशूली-१ जलविद्युत आयोजना

A 216 MW run-of-river project on the Trishuli River in Rasuwa, the largest Korean-invested hydropower project in Nepal, developed by NWEDC with KOEN, IFC and other lenders. The main tunnel is complete and the weir gate was operated in May 2026, with overall progress around 82%. Trishuli floods in 2024 and 2025 disrupted works; completion is targeted for mid-2027.

Installed capacity

216 MW

Run-of-river

River / basin

Trishuli

Gandaki basin

Location

Rasuwa

Bagmati

Expected online

2027

Under construction

Project timeline

Milestones & projected timeline

Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.

  1. 2019

    Foundation stone laid; construction began

  2. May 2026

    Weir gate operation ceremony; ~82% progress

  3. 2027Planned

    Expected commissioning (mid-2027)

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Upper Trishuli-1 Hydroelectric Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Upper Trishuli-1 Hydroelectric Project?+

The Upper Trishuli-1 Hydroelectric Project has an installed capacity of 216 MW. It is a run-of-river hydropower scheme.

Which river is the Upper Trishuli-1 Hydroelectric Project on?+

The project is on the Trishuli River, part of Nepal's Gandaki basin, in Rasuwa district, Bagmati Province.

Who is developing the Upper Trishuli-1 Hydroelectric Project?+

The Upper Trishuli-1 Hydroelectric Project is developed by Nepal Water and Energy Development Company (NWEDC) (foreign-funded), with Korea South-East Power (KOEN), KIND, IFC, Daelim/Doosan.

What is the status of the Upper Trishuli-1 Hydroelectric Project?+

As of mid-2026 the project is under construction.

When is the Upper Trishuli-1 Hydroelectric Project expected to be commissioned?+

The Upper Trishuli-1 Hydroelectric Project is expected to be commissioned around 2027, though dates for projects under development frequently shift.

Sources & data note

Figures for Upper Trishuli-1 Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.