AmarnepalNepal Data
OperationalCommissioned 1999

Indrawati III Hydropower Projectइन्द्रावती-३

A 7.5 MW run-of-river plant on the Indrawati River in Sindhupalchok, developed by National Hydropower Company Ltd. In operation since 1999 and one of Nepal's early publicly listed IPP plants.

Installed capacity

7.5 MW

Run-of-river

River / basin

Indrawati

Koshi basin

Location

Sindhupalchok

Bagmati

Commissioned

1999

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 1999

    Commissioned

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Indrawati III Hydropower Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Indrawati III Hydropower Project?+

The Indrawati III Hydropower Project has an installed capacity of 7.5 MW. It is a run-of-river hydropower scheme.

Which river is the Indrawati III Hydropower Project on?+

The project is on the Indrawati River, part of Nepal's Koshi basin, in Sindhupalchok district, Bagmati Province.

Who is developing the Indrawati III Hydropower Project?+

The Indrawati III Hydropower Project is developed by National Hydropower Company Ltd (private (ipp)).

What is the status of the Indrawati III Hydropower Project?+

As of mid-2026 the project is operational.

When was the Indrawati III Hydropower Project commissioned?+

The Indrawati III Hydropower Project was commissioned in 1999.