OperationalCommissioned 2023

Likhu A Hydropower Projectलिखु ए

A 29.04 MW run-of-river plant on the Likhu Khola in Ramechhap, part of MV Dugar Group's Likhu cluster, with Andritz turbines. It started commercial generation in early 2023.

Installed capacity

29 MW

Run-of-river

River / basin

Likhu Khola

Koshi basin

Location

Ramechhap

Bagmati

Commissioned

2023

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. Feb 2023

    Commercial generation began

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Likhu A Hydropower Project: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Likhu A Hydropower Project?+

The Likhu A Hydropower Project has an installed capacity of 29 MW. It is a run-of-river hydropower scheme.

Which river is the Likhu A Hydropower Project on?+

The project is on the Likhu Khola River, part of Nepal's Koshi basin, in Ramechhap district, Bagmati Province.

Who is developing the Likhu A Hydropower Project?+

The Likhu A Hydropower Project is developed by Likhu Energy Ltd (MV Dugar Group) (private (ipp)).

What is the status of the Likhu A Hydropower Project?+

As of mid-2026 the project is operational.

When was the Likhu A Hydropower Project commissioned?+

The Likhu A Hydropower Project was commissioned in 2023.

Sources & data note

Figures for Likhu A Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.