Nyadi Hydropower Projectन्यादी
A 30 MW run-of-river plant on the Nyadi Khola (a Marsyangdi tributary) at Bahundanda, Lamjung, developed by Nyadi Hydropower Ltd — a joint venture of Butwal Power Company and Lamjung Electricity Development Co. It entered operation in the early 2020s.
Installed capacity
30 MW
Run-of-river
River / basin
Nyadi Khola
Gandaki basin
Location
Lamjung
Gandaki
Commissioned
2021
Operational
Milestones to commissioning
The route from construction to commercial operation.
- 2017
Construction commenced
- 2021
Commercial operation (approx.)
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Nyadi Hydropower Project: key facts
Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.
What is the capacity of the Nyadi Hydropower Project?+
The Nyadi Hydropower Project has an installed capacity of 30 MW. It is a run-of-river hydropower scheme.
Which river is the Nyadi Hydropower Project on?+
The project is on the Nyadi Khola River, part of Nepal's Gandaki basin, in Lamjung district, Gandaki Province.
Who is developing the Nyadi Hydropower Project?+
The Nyadi Hydropower Project is developed by Nyadi Hydropower Ltd (BPC / LEDCO) (joint venture).
What is the status of the Nyadi Hydropower Project?+
As of mid-2026 the project is operational.
When was the Nyadi Hydropower Project commissioned?+
The Nyadi Hydropower Project was commissioned in 2021.
Sources & data note
Figures for Nyadi Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.