AmarnepalNepal Data
OperationalCommissioned 2016

Upper Madi Hydropower Stationमाथिल्लो मादी

A 25 MW run-of-river plant on the Madi River in Kaski, developed by Madi Power Pvt. Ltd. It began commercial operation on 25 October 2016.

Installed capacity

25 MW

Run-of-river

River / basin

Madi

Gandaki basin

Location

Kaski

Gandaki

Commissioned

2016

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 25 Oct 2016

    Commercial operation began

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors
Questions

Upper Madi Hydropower Station: key facts

Quick answers on capacity, river, developer, status and commissioning, drawn from the sourced data above.

What is the capacity of the Upper Madi Hydropower Station?+

The Upper Madi Hydropower Station has an installed capacity of 25 MW. It is a run-of-river hydropower scheme.

Which river is the Upper Madi Hydropower Station on?+

The project is on the Madi River, part of Nepal's Gandaki basin, in Kaski district, Gandaki Province.

Who is developing the Upper Madi Hydropower Station?+

The Upper Madi Hydropower Station is developed by Madi Power Pvt. Ltd (private (ipp)).

What is the status of the Upper Madi Hydropower Station?+

As of mid-2026 the project is operational.

When was the Upper Madi Hydropower Station commissioned?+

The Upper Madi Hydropower Station was commissioned in 2016.

Sources & data note

Figures for Upper Madi Hydropower Station are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.